The Macallan Distillery  

installation of SUBS pond at the Macallan Distillery

Client

The Macallan Distillery

Main Contractor

Robertson Construction Northern

Project

Development of new warehouses and storage facilities (Phases 1 – 4)

Location

Aberlour, Moray

Project Summary:

Installation of new surface water drainage system up to depths of 7 meters and varying pipe sizes which were up to 900 mm in diameter. Construction of access road throughout the site including kerbing. Excavation of pad foundations for new storage facilities.   

“In my principal role dealing with Projects when they have been handed over, I have used GDC on numerous occasions over many years. Our Projects have included numerous contracts within the whisky industry, where scrutiny of safety and workmanship are at there highest level and I have never had any issues with their professionalism or workmanship. In fact they have been exceptional in both areas. ”