Prime Four Business Park, Aberdeen  

Breaking out rock for drainage using 22 tonne excavator and hydraulic breaker at Prime Four Business Park development

Client

Drum Property Group Ltd

Main Contractor

Leiths Group and Sir Robert McAlpine

Project

Construction of high specification office buildings and a hotel

Location

Prime Four Business Park, Kingswells, Aberdeen 

Project Summary:

From 2012 to 2016, we were contracted by Leiths Group, and latterly by Sir Robert McAlpine, to carry out a wide range of drainage services on Phases 1, 2, 3 and 4 of the project. The drainage works included: 

  • Installation of utility ducting and trenching for gas and water pipes and electric cables. 
  • Laying new foul water and storm systems including attenuation tanks for each building.    

We also carried out road works on the C89 link road into the business park, which included kerbing and ducting.